Skip to content

FAQ/ I want to operate the end-of-flow drainage station based on the tide level

We want to install a drainage station at the end of the river flow, and when the tide level reaches the closed water level, we want to close the sluice gate and run the pump.

Also, if the tide level does not reach the closed water level, we want to open the sluice gate and stop the pump.

Is this configurable?

response

It's possible.

Set the properties of the drainage station [Mode of operation] [Pump + Himon] to and set [Operation rules] to [Outside water level + natural flow] .

For more information, please refer to Technical Reference / Boundary Conditions - End-of-Flow Drainage Station .


Last update: 2023-03-20