Skip to content

Condition setting Individual operation/ Sewage

Create a new sewage system

Please refer to Flow Rate/Embankment/Sewage / Embankment/Creating a New Gutter/Gutter.

Set the drainage volume

  1. Select the sewage you want to specify the amount of wastewater from >> in the DioVISTA project menu list [Simulation conditions] [Structures] and [sewage] click it.

  2. Click under Property Drainage (m^3/s). [...]

  3. The drainage setting screen appears.

  4. Enter the time (s) and flow rate (m^3/s).

    • By default, it is 100 (m^3/s).
  5. When you are finished [OK] , click .

Set the sewage burial depth

  1. Select the sewage for which you want to specify the burial depth [Simulation conditions] from >[Structures]> [sewage] in the DioVISTA project menu list , and click it.

  2. Click in the sewage data of the properties [...] .

  3. Enter the burial depth (m) or tube elevation (m).

    • The buried depth (m) defaults to terrain elevation (m).
    • Latitude, longitude and terrain elevation (m) are automatically obtained from the shape and terrain of sewage.
    • The buried depth (m) and tube elevation (m) are displayed so that terrain elevation (m) = buried depth (m) + tube elevation (m).
  4. When you are finished [OK] , click .

Make advanced settings for sewage

  • Please make various settings in Properties.


Last update: 2023-03-20